{"id":153553,"date":"2016-02-08T17:08:58","date_gmt":"2016-02-08T17:08:58","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=11973"},"modified":"2016-02-08T17:08:58","modified_gmt":"2016-02-08T17:08:58","slug":"install-o-matic-one-solar-company-is-turning-the-jobsite-into-a-factory","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/install-o-matic-one-solar-company-is-turning-the-jobsite-into-a-factory\/","title":{"rendered":"Install-O-Matic: One solar company is turning the jobsite into a factory"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ever since the first solar PV system was installed, someone has been trying to remove components from it. Many of these are small and surgical &mdash; what used to need four bolts now needs two, what used to need clips no longer needs them &mdash; with each incremental reduction helping<a href=\"http:\/\/solarbuildermag.com\/news\/automated-solar-installation-robotic-technology\/\">Read More<\/a><\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[6228,13831,13203,12507,4737,13797,12637,2906,13172],"class_list":["post-153553","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-automation","tag-brittmore-group","tag-commercial","tag-equipment","tag-featured","tag-january-february-2016-print-issue","tag-mounting-guide","tag-news","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/153553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=153553"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/153553\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=153553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=153553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=153553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}