{"id":155695,"date":"2016-02-15T15:41:48","date_gmt":"2016-02-15T15:41:48","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12243"},"modified":"2016-02-15T15:41:48","modified_gmt":"2016-02-15T15:41:48","slug":"nevada-puc-votes-for-slower-phase-in-of-higher-rates-pleasing-no-one","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/nevada-puc-votes-for-slower-phase-in-of-higher-rates-pleasing-no-one\/","title":{"rendered":"Nevada PUC votes for slower phase-in of higher rates, pleasing no one"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The rate issues in Nevada didn&rsquo;t improve&nbsp;for the solar industry as the Public Utilities Commission voted to keep the new higher rates for solar customers, only deciding to&nbsp;extend the phase-in over a longer period of time. The Background: The PUC approved new, higher rates in December for solar customers after<a href=\"http:\/\/solarbuildermag.com\/news\/nevada-puc-votes-for-slower-phase-in-of-higher-rates\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2397,654,2906,13839,10045],"class_list":["post-155695","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-net-metering","tag-nevada","tag-news","tag-rates","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/155695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=155695"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/155695\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=155695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=155695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=155695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}