{"id":155732,"date":"2016-02-15T18:52:43","date_gmt":"2016-02-15T18:52:43","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12249"},"modified":"2016-02-15T18:52:43","modified_gmt":"2016-02-15T18:52:43","slug":"solar-frontiers-20-mw-calipatria-solar-plant-sold-to-southern-power-turner-renewable","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-frontiers-20-mw-calipatria-solar-plant-sold-to-southern-power-turner-renewable\/","title":{"rendered":"Solar Frontier\u2019s 20-MW Calipatria solar plant sold to Southern Power, Turner Renewable"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar Frontier Americas sold the 20 MW Calipatria solar power generation plant in Imperial County, Calif., to Southern Power and Turner Renewable Energy. Southern Power&rsquo;s ninth solar acquisition with Turner Renewable Energy, Solar Frontier America&rsquo;s Calipatria project, brings the partnership&rsquo;s overall solar capacity to more than 340 MW operating or<a href=\"http:\/\/solarbuildermag.com\/news\/solar-frontiers-20-mw-calipatria-solar-plant-sold-to-southern-power-turner-renewable\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,10045],"class_list":["post-155732","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/155732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=155732"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/155732\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=155732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=155732"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=155732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}