{"id":156307,"date":"2016-02-17T17:00:43","date_gmt":"2016-02-17T17:00:43","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12272"},"modified":"2016-02-17T17:00:43","modified_gmt":"2016-02-17T17:00:43","slug":"solarcity-readies-solarstorage-system-for-kauai-island-utility-cooperative","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solarcity-readies-solarstorage-system-for-kauai-island-utility-cooperative\/","title":{"rendered":"SolarCity readies solar+storage system for Kaua\u2019i Island Utility Cooperative"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SolarCity is going to install a first-of-its-kind solar array and energy storage system for Kaua&rsquo;i Island Utility Cooperative (KIUC). And you&rsquo;re not going to believe this, but the Elon Musk company has selected Tesla Energy to supply the batteries. SolarCity says it made the selection after conducting a comprehensive competitive<a href=\"http:\/\/solarbuildermag.com\/news\/solarcity-readies-solar-storage-system-kauai\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,442,2906,9667,760,1281,13172],"class_list":["post-156307","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-energy-storage","tag-news","tag-pacific","tag-solarcity","tag-tesla","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/156307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=156307"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/156307\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=156307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=156307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=156307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}