{"id":15723,"date":"2013-08-13T21:08:09","date_gmt":"2013-08-13T21:08:09","guid":{"rendered":"http:\/\/ecowatch.com\/?p=303013"},"modified":"2013-08-13T21:08:09","modified_gmt":"2013-08-13T21:08:09","slug":"recent-rail-explosions-prompt-city-review-of-proposed-crude-oil-transport","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/recent-rail-explosions-prompt-city-review-of-proposed-crude-oil-transport\/","title":{"rendered":"Recent Rail Explosions Prompt City Review of Proposed Crude Oil Transport"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Last week, city officials in Benicia, CA, required a detailed investigation into Valero&#8217;s proposed crude-by-rail terminal. The decision is a setback for Valero, which had hoped to begin construction &#8230; <\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,1,57],"tags":[2903,4740],"class_list":["post-15723","post","type-post","status-publish","format-standard","hentry","category-california-leed-projects","category-green-building-posts","category-leed-news","tag-energy","tag-tar-sands"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/15723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=15723"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/15723\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=15723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=15723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=15723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}