{"id":161234,"date":"2016-03-04T18:00:34","date_gmt":"2016-03-04T18:00:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12474"},"modified":"2016-03-04T18:00:34","modified_gmt":"2016-03-04T18:00:34","slug":"report-looks-at-huge-potential-of-concentrated-solar-power-across-the-globe","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/report-looks-at-huge-potential-of-concentrated-solar-power-across-the-globe\/","title":{"rendered":"Report looks at huge potential of concentrated solar power across the globe"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; The concentrated solar power (CSP) industry is bound to be one of the biggest and most efficient in the coming times ahead. If utilized to its full potential, it could end up providing for the world&rsquo;s 25 percent energy needs by 2050. Currently there is 679 MW of installed<a href=\"http:\/\/solarbuildermag.com\/news\/concentrated-solar-power-report\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1733,2906,1123],"class_list":["post-161234","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-concentrated-solar-power","tag-news","tag-reports"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/161234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=161234"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/161234\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=161234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=161234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=161234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}