{"id":164819,"date":"2016-03-15T17:31:32","date_gmt":"2016-03-15T17:31:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12581"},"modified":"2016-03-15T17:31:32","modified_gmt":"2016-03-15T17:31:32","slug":"agt-selects-aet-ground-mount-system-for-4-7-mw-project-in-florida","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/agt-selects-aet-ground-mount-system-for-4-7-mw-project-in-florida\/","title":{"rendered":"AGT selects AET ground mount system for 4.7-MW project in Florida"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Is the lagging solar market in Florida ready to pick things up? Florida Solar Energy Industries Association&rsquo;s (FlaSEIA) Executive Director Mike Antheil thinks so. &ldquo;Dropping prices on PV and balance of system components, combined with a general population who is energized about solar projects, Florida is ready to live up<a href=\"http:\/\/solarbuildermag.com\/news\/agt-selects-aet-racking-for-4-7-mw-project-in-florida\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,57,9666],"tags":[12940,13885,12941,12496,2906,3000,12497,9751],"class_list":["post-164819","post","type-post","status-publish","format-standard","hentry","category-florida-leed-projects","category-leed-news","category-solar-power-energy","tag-aet","tag-agt","tag-applied-energy-technologies","tag-mounting","tag-news","tag-products","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/164819","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=164819"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/164819\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=164819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=164819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=164819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}