{"id":169598,"date":"2016-03-30T19:33:54","date_gmt":"2016-03-30T19:33:54","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12733"},"modified":"2016-03-30T19:33:54","modified_gmt":"2016-03-30T19:33:54","slug":"goodyear-facility-completes-1-mw-install-with-yaskawa-solectria-inverters","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/goodyear-facility-completes-1-mw-install-with-yaskawa-solectria-inverters\/","title":{"rendered":"Goodyear facility completes 1-MW install with Yaskawa-Solectria inverters"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; Three-phase, transformerless PVI 28TL inverters&nbsp;from&nbsp;Yaskawa &ndash; Solectria Solar were installed at the Goodyear Rubber Manufacturing Facility in Rancho Cucamonga, Calif. The 1-MW solar array is comprised of over 3,000 solar modules powered by 33 Solectria PVI 28TL inverters and cover the main manufacturing plant and five parking canopies. The<a href=\"http:\/\/solarbuildermag.com\/news\/goodyear-facility-completes-1-mw-install-with-yaskawa-solectria-inverters\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,12491,2906,3000,12497,10045,13842],"class_list":["post-169598","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-inverters","tag-news","tag-products","tag-project","tag-west","tag-yaskawa-solectria"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/169598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=169598"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/169598\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=169598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=169598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=169598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}