{"id":171996,"date":"2016-04-07T16:00:54","date_gmt":"2016-04-07T16:00:54","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12819"},"modified":"2016-04-07T16:00:54","modified_gmt":"2016-04-07T16:00:54","slug":"details-on-the-pika-energy-island-system-now-available-for-solar-plus-storage-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-the-pika-energy-island-system-now-available-for-solar-plus-storage-projects\/","title":{"rendered":"Details on the Pika Energy Island system now available for solar-plus-storage projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>It is now the second quarter of 2016, which means that&nbsp;Pika Energy Inc. will begin shipping its new Pika Energy Island systems. &ldquo;The availability of our newest bi-directional inverter comes at a critical time in the solar PV and distributed energy industry,&rdquo; said Pika Energy President Ben Polito. &ldquo;Solar-plus-storage is<a href=\"http:\/\/solarbuildermag.com\/news\/the-pika-energy-island-system-now-available-for-solar-plus-storage-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[573,12491,2906,13740,13923,3000,13095,13648],"class_list":["post-171996","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-batteries","tag-inverters","tag-news","tag-optimizers","tag-pika-energy","tag-products","tag-residential-solar","tag-solarstorage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/171996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=171996"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/171996\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=171996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=171996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=171996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}