{"id":172048,"date":"2016-04-07T20:38:57","date_gmt":"2016-04-07T20:38:57","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12825"},"modified":"2016-04-07T20:38:57","modified_gmt":"2016-04-07T20:38:57","slug":"case-study-how-dce-solars-cap-rack-system-helped-a-4-9-mw-multi-site-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/case-study-how-dce-solars-cap-rack-system-helped-a-4-9-mw-multi-site-project\/","title":{"rendered":"Case study: How DCE Solar\u2019s Cap-Rack System helped a 4.9-MW multi-site project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Overview As the first of five landfill sites in the Meriden, Connecticut area planned for conversion to a solar field, excellent results in terms of budget, performance and environmental safety were a must. Greenskies Renewable Energy knew that there could be no compromise on quality or compliance with procedures for<a href=\"http:\/\/solarbuildermag.com\/news\/dce-solars-cap-rack-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,13785,12945,12496,12637,2906,3000,12497],"class_list":["post-172048","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-dce-solar","tag-ground-mount","tag-mounting","tag-mounting-guide","tag-news","tag-products","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/172048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=172048"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/172048\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=172048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=172048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=172048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}