{"id":172304,"date":"2016-04-08T18:00:23","date_gmt":"2016-04-08T18:00:23","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12835"},"modified":"2016-04-08T18:00:23","modified_gmt":"2016-04-08T18:00:23","slug":"sepa-how-to-achieve-low-lcoe-utility-scale-solar-without-cutting-costs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sepa-how-to-achieve-low-lcoe-utility-scale-solar-without-cutting-costs\/","title":{"rendered":"SEPA: How to achieve low LCOE utility-scale solar without cutting costs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>As energy industry news stories tout record lows in utility-scale solar prices in a handful of jurisdictions across the country, a growing number of utilities are considering integrating these projects into their resource portfolios. But, as a new report from the Solar Electric Power Association (SEPA) says, not all solar<a href=\"http:\/\/solarbuildermag.com\/news\/sepa-how-to-achieve-low-lcoe-utility-scale-solar-without-cutting-costs\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[1590,13605,2906,4522,13172],"class_list":["post-172304","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-financing","tag-lcoe","tag-news","tag-sepa","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/172304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=172304"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/172304\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=172304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=172304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=172304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}