{"id":173861,"date":"2016-04-13T21:00:55","date_gmt":"2016-04-13T21:00:55","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12880"},"modified":"2016-04-13T21:00:55","modified_gmt":"2016-04-13T21:00:55","slug":"allianz-energy-madison-hq-goes-with-rooftop-ballast-mounting-from-sollega","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/allianz-energy-madison-hq-goes-with-rooftop-ballast-mounting-from-sollega\/","title":{"rendered":"Allianz Energy Madison HQ goes with rooftop ballast mounting from Sollega"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Sollega supplied its FastRack ballasted mounting system to H&amp;H Solar for the installation of a 51.8 kW Allianz Energy Madison headquarters rooftop project, WI. H&amp;H Solar has supported Alliant Energy on a research project at its Madison headquarters. The purpose of the project is to evaluate performance and compare different<a href=\"http:\/\/solarbuildermag.com\/news\/allianz-energy-madison-hq-goes-rooftop-ballast-mounting-sollega\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,13926,9679,12637,2906,12497,13221],"class_list":["post-173861","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-hh-solar","tag-midwest","tag-mounting-guide","tag-news","tag-project","tag-sollega-inc"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/173861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=173861"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/173861\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=173861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=173861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=173861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}