{"id":175435,"date":"2016-04-18T21:00:20","date_gmt":"2016-04-18T21:00:20","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12919"},"modified":"2016-04-18T21:00:20","modified_gmt":"2016-04-18T21:00:20","slug":"staten-solar-goes-with-solar-frontier-cis-modules-for-16-california-projects","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/staten-solar-goes-with-solar-frontier-cis-modules-for-16-california-projects\/","title":{"rendered":"Staten Solar goes with Solar Frontier CIS modules for 16 California projects"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solar Frontier,&nbsp;a&nbsp;CIS solar energy solutions provider, will be installing those CIS modules&nbsp;at 16 solar project sites ranging in size up to 522 kW by Staten Solar, a leading EPC provider in California. These solar PV systems will be located in Tulare and Kern Counties of California&rsquo;s Central Valley on farms<a href=\"http:\/\/solarbuildermag.com\/news\/staten-solar-goes-with-solar-frontier-cis-modules-for-16-california-projects\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13931,13292,12487,2906,3000,12497,5863,13659,13932],"class_list":["post-175435","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cis","tag-epc","tag-modules","tag-news","tag-products","tag-project","tag-pv-modules","tag-solar-frontier","tag-staten-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/175435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=175435"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/175435\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=175435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=175435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=175435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}