{"id":175733,"date":"2016-04-19T19:30:15","date_gmt":"2016-04-19T19:30:15","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12938"},"modified":"2016-04-19T19:30:15","modified_gmt":"2016-04-19T19:30:15","slug":"new-microgrids-in-haiti-to-install-demand-response-inverters-from-princeton-power","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/new-microgrids-in-haiti-to-install-demand-response-inverters-from-princeton-power\/","title":{"rendered":"New microgrids in Haiti to install demand response inverters from Princeton Power"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Princeton Power Systems&nbsp;will be&nbsp;supplying its core technology for the first project engineered by Geninov Group of Canada, a consulting engineering firm, and funded by the World Bank to deploy microgrids in Haiti. The Triumph project, which provides light and energy storage in Champ de Mars, Haiti&rsquo;s largest park located in<a href=\"http:\/\/solarbuildermag.com\/news\/haiti-microgrids-install-demand-response-inverter-from-princeton-power\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,697,2906,13310,3000],"class_list":["post-175733","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-microgrid","tag-news","tag-princeton-power","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/175733","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=175733"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/175733\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=175733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=175733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=175733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}