{"id":176065,"date":"2016-04-20T20:11:50","date_gmt":"2016-04-20T20:11:50","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=12953"},"modified":"2016-04-20T20:11:50","modified_gmt":"2016-04-20T20:11:50","slug":"sma-debuts-residential-rapid-shutdown-system-to-use-with-sunny-boy","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/sma-debuts-residential-rapid-shutdown-system-to-use-with-sunny-boy\/","title":{"rendered":"SMA debuts residential rapid shutdown system to use with Sunny Boy"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>SMA&rsquo;s much-anticipated Rapid Shutdown System is now available for immediate shipping to the North American residential PV market. Engineered for use with SMA&rsquo;s Sunny Boy inverter line with Secure Power Supply&mdash;including the new 5.0-US and 6.0-US models&mdash;this simple, reliable and cost-effective solution achieves all requirements for 2014 NEC 690.12 rapid<a href=\"http:\/\/solarbuildermag.com\/news\/sma-debuts-rapid-shutdown-system-use-sunny-boy\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,2906,3000,13627,13095,13436],"class_list":["post-176065","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-news","tag-products","tag-rapid-system-shutdown","tag-residential-solar","tag-sma-america"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/176065","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=176065"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/176065\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=176065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=176065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=176065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}