{"id":17908,"date":"2013-10-28T12:30:05","date_gmt":"2013-10-28T12:30:05","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=030524f6960c5d0ac09cad83f4ac002c"},"modified":"2013-10-28T12:30:05","modified_gmt":"2013-10-28T12:30:05","slug":"pv-power-plant-controller-centralizes-monitoring-operations","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/pv-power-plant-controller-centralizes-monitoring-operations\/","title":{"rendered":"PV Power Plant Controller centralizes monitoring, operations."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Providing one point of integrated control and monitoring, Santerno Power Plant Controller (PPC) consolidates&nbsp;PV power plant management. Utility-scale solar power system controller, eliminating need for multiple controllers, includes self-tuned, modified proportional internal (PI) controller&nbsp;that operates at plant level to make sure all inverters match power grid code requirements. Solution is configurable for most grid operator protocols and complies with European and worldwide standards.<\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/software\" target=\"_blank\">Software<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/green-clean\" target=\"_blank\">Green &amp; Clean<\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/process-control-software-6568-1.html\" target=\"_blank\">Process Control Software<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/plant-maintenance-software-17269002-1.html\" target=\"_blank\">Plant Maintenance Software<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/energy-power-utility-software-17265083-1.html\" target=\"_blank\">Energy, Power &amp; Utility Software<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-17908","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/17908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=17908"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/17908\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=17908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=17908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=17908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}