{"id":179882,"date":"2016-05-02T15:16:48","date_gmt":"2016-05-02T15:16:48","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13073"},"modified":"2016-05-02T15:16:48","modified_gmt":"2016-05-02T15:16:48","slug":"kaco-extends-inverter-product-range-at-intersolar-europe","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/kaco-extends-inverter-product-range-at-intersolar-europe\/","title":{"rendered":"KACO extends inverter product range at Intersolar Europe"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; KACO&rsquo;s motto is &ldquo;the full program&rdquo; because the Neckarsulm, Germany-based inverter manufacturer prides itself on offering an appropriate solution for any size PV system &mdash; from 250 watts right up to the megawatt class. To further that mission, the company debuted new tailor-made products&nbsp;at&nbsp;Intersolar Europe in Munich that widen<a href=\"http:\/\/solarbuildermag.com\/news\/kaco-extends-inverter-product-range-at-intersolar-europe\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13223,12491,13714,2906,3000],"class_list":["post-179882","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-intersolar-europe","tag-inverters","tag-kaco","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/179882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=179882"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/179882\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=179882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=179882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=179882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}