{"id":18127,"date":"2013-11-01T19:13:30","date_gmt":"2013-11-01T19:13:30","guid":{"rendered":"http:\/\/www.solarbuildermag.com\/?p=5494"},"modified":"2013-11-01T19:13:30","modified_gmt":"2013-11-01T19:13:30","slug":"139-mw-campo-verde-solar-now-operational-with-2-3-million-thin-film-modules","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/139-mw-campo-verde-solar-now-operational-with-2-3-million-thin-film-modules\/","title":{"rendered":"139-MW Campo Verde Solar Now Operational with 2.3 Million Thin-Film Modules"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The largest solar installation acquired by Southern Company subsidiary Southern Power in partnership with Turner Renewable Energy, the Campo Verde Solar Facility, began commercial operation on Oct. 25. The 139-MW solar photovoltaic (PV) installation in Imperial County, Calif., more than [&hellip;]<\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,9668],"class_list":["post-18127","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-regional"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/18127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=18127"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/18127\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=18127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=18127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=18127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}