{"id":182072,"date":"2016-05-09T19:30:08","date_gmt":"2016-05-09T19:30:08","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13225"},"modified":"2016-05-09T19:30:08","modified_gmt":"2016-05-09T19:30:08","slug":"this-ag-solar-project-is-the-largest-net-meter-install-in-californias-monterey-county","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/this-ag-solar-project-is-the-largest-net-meter-install-in-californias-monterey-county\/","title":{"rendered":"This ag solar project is the largest net-meter install in California\u2019s Monterey County"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>CalCom Solar, a company specializing in design-build solar projects for agribusinesses and water districts, has installed a new 2.2-MW solar power system at D&rsquo;Arrigo Bros. Co., of Calif., a premier grower, packer and shipper of quality fruits and vegetables, in Salinas, Calif. &ldquo;CalCom Solar had the technology and knowledge that<a href=\"http:\/\/solarbuildermag.com\/news\/this-ag-solar-project-is-the-largest-net-meter-install-in-californias-monterey-county\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13009,13972,2906,13010,12497,13728,10045],"class_list":["post-182072","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-calcom-solar","tag-commerical","tag-news","tag-nextracker","tag-project","tag-trackers","tag-west"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/182072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=182072"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/182072\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=182072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=182072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=182072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}