{"id":184512,"date":"2016-05-17T17:37:14","date_gmt":"2016-05-17T17:37:14","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13311"},"modified":"2016-05-17T17:37:14","modified_gmt":"2016-05-17T17:37:14","slug":"delta-debuts-wall-mounted-80-kw-solar-inverter","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/delta-debuts-wall-mounted-80-kw-solar-inverter\/","title":{"rendered":"Delta debuts wall-mounted 80-kW solar inverter"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Delta, a provider of power and thermal management solutions, unveiled&nbsp;its new M80U PV&nbsp;inverter &mdash; the first wall mount 80kW string inverter in the world. The M80U is a grid-tied, 3-phase and transformerless inverter that converts DC&nbsp;output from a PV&nbsp;system into AC&nbsp;with 98.8 percent efficiency, allowing it to be seamlessly used<a href=\"http:\/\/solarbuildermag.com\/news\/delta-debuts-wall-mounted-80-kw-solar-inverter\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13860,12491,2906,3000,13172],"class_list":["post-184512","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-delta-group","tag-inverters","tag-news","tag-products","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/184512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=184512"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/184512\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=184512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=184512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=184512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}