{"id":186414,"date":"2016-05-23T19:00:33","date_gmt":"2016-05-23T19:00:33","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13360"},"modified":"2016-05-23T19:00:33","modified_gmt":"2016-05-23T19:00:33","slug":"groundbreaking-held-for-mississippis-largest-solar-facility","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/groundbreaking-held-for-mississippis-largest-solar-facility\/","title":{"rendered":"Groundbreaking held for Mississippi\u2019s largest solar facility"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Mississippi Power and Origis Energy, along with officials from the Area Development Partnership and Lamar County, held a groundbreaking ceremony for what will be the state&rsquo;s largest solar facility. When operational, the $100-million facility will generate 52 MW, enough electricity to power approximately 8,000 homes. Mississippi Power will receive all<a href=\"http:\/\/solarbuildermag.com\/news\/mississippis-largest-solar-facility\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[564,2906,13996,12497,9751,13172],"class_list":["post-186414","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-mississippi","tag-news","tag-origis-energy","tag-project","tag-south","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/186414","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=186414"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/186414\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=186414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=186414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=186414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}