{"id":189646,"date":"2016-06-03T13:29:34","date_gmt":"2016-06-03T13:29:34","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13449"},"modified":"2016-06-03T13:29:34","modified_gmt":"2016-06-03T13:29:34","slug":"gamechange-solar-introduces-5-7-week-lead-time-for-trackers","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/gamechange-solar-introduces-5-7-week-lead-time-for-trackers\/","title":{"rendered":"GameChange Solar introduces 5-7 week lead time for trackers"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>GameChange Solar announced that it has implemented a five to seven week delivery time as standard for all tracker structural components, effective immediately. By the fourth quarter of 2016, this five to seven week standard will include the complete system with controllers and actuators (which currently require an additional two<a href=\"http:\/\/solarbuildermag.com\/news\/gamechange-solar-introduces-5-7-week-lead-time-trackers\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13908,2906,3000,13050,13728],"class_list":["post-189646","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-gamechange-solar","tag-news","tag-products","tag-solar-trackers","tag-trackers"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/189646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=189646"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/189646\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=189646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=189646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=189646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}