{"id":190821,"date":"2016-06-07T13:44:24","date_gmt":"2016-06-07T13:44:24","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13482"},"modified":"2016-06-07T13:44:24","modified_gmt":"2016-06-07T13:44:24","slug":"minnesota-solar-rebates-to-be-extended-community-solar-coming-online-maybe-for-real-this-time","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/minnesota-solar-rebates-to-be-extended-community-solar-coming-online-maybe-for-real-this-time\/","title":{"rendered":"Minnesota solar: Rebates to be extended, community solar coming online (maybe for real this time)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>&nbsp; Minnesota&rsquo;s long-awaited community solar project may be ready to commence construction after the Public Utilities Commission approved the plan and the Minnesota Court of Appeals upheld the size limitations that were challenged by developer Sunrise Energy Ventures. A 2013 state law required utility Xcel Energy to offer the community<a href=\"http:\/\/solarbuildermag.com\/news\/minnesota-solar-rebates-extended-community-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,5520,9666],"tags":[811,9679,2906,12497,10765,13172],"class_list":["post-190821","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-minnesota-leed-projects","category-solar-power-energy","tag-community-solar","tag-midwest","tag-news","tag-project","tag-regulation","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/190821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=190821"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/190821\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=190821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=190821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=190821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}