{"id":191527,"date":"2016-06-09T18:47:05","date_gmt":"2016-06-09T18:47:05","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13498"},"modified":"2016-06-09T18:47:05","modified_gmt":"2016-06-09T18:47:05","slug":"solarcheck-rapid-shutdown-device-is-integrated-directly-onto-the-panel","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solarcheck-rapid-shutdown-device-is-integrated-directly-onto-the-panel\/","title":{"rendered":"Solarcheck Rapid Shutdown device is integrated directly onto the panel"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>NEC 690.12 dictates that all rooftop solar PV systems must have a rapid shutdown function to protect first responders from electric shock in the event of an emergency. Phoenix Contact has developed an NEC 690.12-compliant solution for the safe, rapid shutdown of rooftop PV systems. SOLARCHECK RSD (Rapid Shutdown) is<a href=\"http:\/\/solarbuildermag.com\/news\/solarcheck-rapid-shutdown-device-is-integrated-directly-onto-the-panel\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13333,12491,2906,14026,3000,13627,14027],"class_list":["post-191527","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-intersolar","tag-inverters","tag-news","tag-phoenix-contact","tag-products","tag-rapid-system-shutdown","tag-solarcheck-rsd"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/191527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=191527"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/191527\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=191527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=191527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=191527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}