{"id":192944,"date":"2016-06-14T13:00:14","date_gmt":"2016-06-14T13:00:14","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13097"},"modified":"2016-06-14T13:00:14","modified_gmt":"2016-06-14T13:00:14","slug":"what-lies-beneath-mount-a-string-inverter-under-an-array-with-this-integration","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/what-lies-beneath-mount-a-string-inverter-under-an-array-with-this-integration\/","title":{"rendered":"What lies beneath: Mount a string inverter under an array with this integration"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>PV systems are just a series of connections &mdash; modules to strings, panels to racking, inverters to the grid, etc. These pieces often all come from different places, and an installer can find real benefit in solutions that come ready to connect quickly and easily &mdash; like the integration Sollega<a href=\"http:\/\/solarbuildermag.com\/featured\/mount-string-inverter-under-an-array\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13197,13203,4737,13805,12491,13974,12874,12496,2906,3000,14020],"class_list":["post-192944","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ballast","tag-commercial","tag-featured","tag-hiq-solar","tag-inverters","tag-may-june-2016-print-issue","tag-microinverters","tag-mounting","tag-news","tag-products","tag-sollega"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/192944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=192944"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/192944\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=192944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=192944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=192944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}