{"id":199131,"date":"2016-07-05T14:00:42","date_gmt":"2016-07-05T14:00:42","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13815"},"modified":"2016-07-05T14:00:42","modified_gmt":"2016-07-05T14:00:42","slug":"three-years-later-how-is-this-ohio-universitys-solar-array-performing","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/three-years-later-how-is-this-ohio-universitys-solar-array-performing\/","title":{"rendered":"Three years later: How is this Ohio university\u2019s solar array performing?"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Cedarville University made a bold choice (at least in Ohio) to install a solar array&nbsp;three years ago &mdash; still&nbsp;the largest to be directly connected to any university in Ohio &mdash; and it has made a significant environmental and financial impact through these&nbsp;first three years of operation. Throughout its lifetime the<a href=\"http:\/\/solarbuildermag.com\/news\/three-years-later-how-is-this-ohio-universitys-solar-array-performing\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13587,14052,9679,2906,12497],"class_list":["post-199131","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-college","tag-melink-corp","tag-midwest","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/199131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=199131"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/199131\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=199131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=199131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=199131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}