{"id":205753,"date":"2016-07-26T20:41:45","date_gmt":"2016-07-26T20:41:45","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14001"},"modified":"2016-07-26T20:41:45","modified_gmt":"2016-07-26T20:41:45","slug":"gamechange-solar-receives-order-for-111-mw-of-fixed-tilt-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/gamechange-solar-receives-order-for-111-mw-of-fixed-tilt-system\/","title":{"rendered":"GameChange Solar receives order for 111 MW of fixed tilt system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>GameChange Solar sent word&nbsp;that two leading EPCs ordered over 111 MW of its pile-driven fixed tilt racking systems for immediate production. The systems are GameChange Max-Span Post System for poly panels. These projects are part of an expected 1 GW for GameChange in the USA solar racking market this year.<a href=\"http:\/\/solarbuildermag.com\/news\/gamechange-solar-receives-order-for-111-mw-of-fixed-tilt-system\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14077,13908,12496,2906,3000,13255],"class_list":["post-205753","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-fixed-tilt","tag-gamechange-solar","tag-mounting","tag-news","tag-products","tag-racking"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/205753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=205753"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/205753\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=205753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=205753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=205753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}