{"id":206367,"date":"2016-07-28T13:48:18","date_gmt":"2016-07-28T13:48:18","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14023"},"modified":"2016-07-28T13:48:18","modified_gmt":"2016-07-28T13:48:18","slug":"adara-power-energy-storage-systems-added-to-heco-qualified-equipment-list","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/adara-power-energy-storage-systems-added-to-heco-qualified-equipment-list\/","title":{"rendered":"Adara Power energy storage systems added to HECO qualified equipment list"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Adara Power, a privately-held Silicon Valley company working on some really cool&nbsp;energy storage technology, sent word that its&nbsp;Adara Energy Storage System has been added to the Hawaiian Electric Company (HECO) list of qualified equipment for customer self supply (CSS) installations. Residential solar customers in Hawaii are now able to install<a href=\"http:\/\/solarbuildermag.com\/news\/adara-power-energy-storage-systems-added-heco-qualified-equipment-list\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14080,573,442,249,2906,3000],"class_list":["post-206367","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-adara-power","tag-batteries","tag-energy-storage","tag-hawaii","tag-news","tag-products"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/206367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=206367"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/206367\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=206367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=206367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=206367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}