{"id":208012,"date":"2016-08-02T13:00:57","date_gmt":"2016-08-02T13:00:57","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=13648"},"modified":"2016-08-02T13:00:57","modified_gmt":"2016-08-02T13:00:57","slug":"enter-the-matrix-how-much-can-a-pv-system-change-when-you-wire-cells-in-parallel","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/enter-the-matrix-how-much-can-a-pv-system-change-when-you-wire-cells-in-parallel\/","title":{"rendered":"Enter the Matrix: How much can a PV system change when you wire cells in parallel?"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>All PV power generation starts with a simple cell. One is wired to the next, then to the next, and then those are grouped into modules and then into panels and then strung together and so on. So, what happens when you change how that single cell exists within the<a href=\"http:\/\/solarbuildermag.com\/featured\/wiring-solar-cells-in-parallel-with-ten-k-solar\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,14043,12487,2906,5863,13897,14022],"class_list":["post-208012","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-july-august-2016-print-issue","tag-modules","tag-news","tag-pv-modules","tag-pv-system","tag-ten-k-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/208012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=208012"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/208012\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=208012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=208012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=208012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}