{"id":213103,"date":"2016-08-18T17:30:32","date_gmt":"2016-08-18T17:30:32","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14187"},"modified":"2016-08-18T17:30:32","modified_gmt":"2016-08-18T17:30:32","slug":"ross-solar-group-secures-pace-funding-for-commercial-install-in-connecticut","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ross-solar-group-secures-pace-funding-for-commercial-install-in-connecticut\/","title":{"rendered":"Ross Solar Group secures PACE funding for commercial install in Connecticut"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ross Solar Group has secured funding to complete an upcoming solar installation for Mike&rsquo;s Famous Harley-Davidson, located at the historic Coca-Cola factory in New London, Conn. This project will offset 100&nbsp;percent&nbsp;of the Mike&rsquo;s Famous&rsquo; electrical energy needs through the installation of high-efficiency SunPower modules. Solar will complement the many other<a href=\"http:\/\/solarbuildermag.com\/financing\/ross-solar-group-secures-pace-funding-for-commercial-install-in-connecticut\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,1590,2906,7126,12497,13773],"class_list":["post-213103","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-financing","tag-news","tag-pace","tag-project","tag-ross-solar-group"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/213103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=213103"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/213103\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=213103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=213103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=213103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}