{"id":21541,"date":"2014-01-31T13:31:50","date_gmt":"2014-01-31T13:31:50","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=a76b67fc732793beedc50275bd89a8f5"},"modified":"2014-01-31T13:31:50","modified_gmt":"2014-01-31T13:31:50","slug":"ultra-short-receptacle-supports-400-vdc-20-a-loads","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ultra-short-receptacle-supports-400-vdc-20-a-loads\/","title":{"rendered":"Ultra Short Receptacle supports 400 Vdc, 20 A loads."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>UL rated for safe disconnect of 400 Vdc, 20 A loads, Saf-D-Grid&reg; Ultra Short Receptacle meets safety requirements for hazardous, low voltage applications per UL1977 and IEC 61984, as well as touch safety requirements of UL60950 and IEC60950.&nbsp;Proper voltage clearance and DC arc protection are achieved through unique geometries which minimize DC arc flash while shielding operator. Size compatible with 19.9 x 26.8 mm panel cut out,&nbsp;receptacle&nbsp;enables solder termination to wire.<\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/electronic-components-devices\" target=\"_blank\">Electronic Components and Devices<\/a> Sponsored by:  <a target=\"_blank\" href=\"http:\/\/news.thomasnet.com\/redir.html?lnty=rssad&amp;spclid=9476&amp;prid=20020954&amp;cat=772&amp;goto=http%3A%2F%2Fwww.globtek.com\">Globtek Inc. &#8211; Your Power Partner&#8230;For Over 20 Years!<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/electrical-equipment-systems\" target=\"_blank\">Electrical Equipment and Systems<\/a> Sponsored by:  <a target=\"_blank\" href=\"http:\/\/news.thomasnet.com\/redir.html?lnty=rssad&amp;spclid=9509&amp;prid=20020954&amp;cat=612&amp;goto=http%3A%2F%2Fwww.globtek.com\">Globtek Inc. &#8211; MOBILE BANNER AD<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/mounting-attaching-products\" target=\"_blank\">Mounting and Attaching Products<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/news\/green-clean\" target=\"_blank\">Green &amp; Clean<\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/electronic-connectors-17530908-1.html\" target=\"_blank\">Electronic Connectors<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electric-power-connectors-17530403-1.html\" target=\"_blank\">Electric Power Connectors<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electric-connectors-17491754-1.html\" target=\"_blank\">Electric Connectors<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/connectors-17470600-1.html\" target=\"_blank\">Connectors<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electric-receptacles-66304007-1.html\" target=\"_blank\">Electric Receptacles<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electric-plugs-receptacles-61840807-1.html\" target=\"_blank\">Electric Plugs &amp; Receptacles<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/receptacle-adapters-370809-1.html\" target=\"_blank\">Receptacle Adapters<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-21541","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/21541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=21541"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/21541\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=21541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=21541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=21541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}