{"id":217660,"date":"2016-09-02T13:33:08","date_gmt":"2016-09-02T13:33:08","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14351"},"modified":"2016-09-02T13:33:08","modified_gmt":"2016-09-02T13:33:08","slug":"baker-electric-installs-167-kw-rooftop-system-for-meziere-enterprises","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/baker-electric-installs-167-kw-rooftop-system-for-meziere-enterprises\/","title":{"rendered":"Baker Electric installs 167-kW rooftop system for Meziere Enterprises"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Baker Electric Solar&nbsp;designed and installed a 167-kW rooftop solar system for Meziere Enterprises, cooling system manufacturer in Escondido, Calif. The company expects to see a 60-70 percent reduction in its annual electricity spend based on past consumption. It&rsquo;s projected that Meziere will save an estimated $60,000 in energy costs in<a href=\"http:\/\/solarbuildermag.com\/news\/baker-electric-installs-167-kw-rooftop-system-for-meziere-enterprises\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13914,13203,2906,9667,12497],"class_list":["post-217660","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baker-electric-solar","tag-commercial","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/217660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=217660"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/217660\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=217660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=217660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=217660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}