{"id":219575,"date":"2016-09-08T13:08:25","date_gmt":"2016-09-08T13:08:25","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14414"},"modified":"2016-09-08T13:08:25","modified_gmt":"2016-09-08T13:08:25","slug":"new-mexicos-first-commercial-solar-plus-storage-project-now-up-and-running-with-sharps-smartstorage","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/new-mexicos-first-commercial-solar-plus-storage-project-now-up-and-running-with-sharps-smartstorage\/","title":{"rendered":"New Mexico\u2019s first commercial solar-plus-storage project now up and running with Sharp\u2019s SmartStorage"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>A Roadrunner Food Bank became the first commercial solar-plus-storage project in New Mexico, thanks to Sharp Electronics Corporation&rsquo;s Energy Systems and Services Group (Sharp) and Albuquerque-based Affordable Solar Installation Inc. (ASI). The project features two Sharp 30-kW SmartStorage systems, paired with the site&rsquo;s existing 366-kW solar rooftop array. Sharp&rsquo;s SmartStorage<a href=\"http:\/\/solarbuildermag.com\/news\/new-mexicos-first-commercial-solar-plus-storage-project-now-up-and-running-with-sharps-smartstorage\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13203,442,2906,12497,13462],"class_list":["post-219575","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial","tag-energy-storage","tag-news","tag-project","tag-sharp-electronics"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/219575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=219575"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/219575\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=219575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=219575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=219575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}