{"id":223676,"date":"2016-09-21T19:53:52","date_gmt":"2016-09-21T19:53:52","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14619"},"modified":"2016-09-21T19:53:52","modified_gmt":"2016-09-21T19:53:52","slug":"canadian-solar-orders-one-of-the-largest-single-project-deployments-of-dc-optimizers","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/canadian-solar-orders-one-of-the-largest-single-project-deployments-of-dc-optimizers\/","title":{"rendered":"Canadian Solar orders one of the largest single-project deployments of DC optimizers"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Canadian Solar is going to deploy Ampt LLC DC optimizers in a 33-MW PV system, which would make it one of the largest deployments of DC power optimizers in the world.&nbsp;The 33 MW installation capped off a six-month evaluation period by Canadian Solar, which began with a smaller demonstration project.<a href=\"http:\/\/solarbuildermag.com\/news\/canadian-solar-orders-largest-single-project-deployment-of-dc-optimizers\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13258,12961,13203,13698,12491,2906,3000,13172],"class_list":["post-223676","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ampt","tag-canadian-solar","tag-commercial","tag-dc-optimizers","tag-inverters","tag-news","tag-products","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/223676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=223676"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/223676\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=223676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=223676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=223676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}