{"id":228128,"date":"2016-10-07T16:00:02","date_gmt":"2016-10-07T16:00:02","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14777"},"modified":"2016-10-07T16:00:02","modified_gmt":"2016-10-07T16:00:02","slug":"top-4-solar-projects-of-the-week-oct-3-oct-7","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/top-4-solar-projects-of-the-week-oct-3-oct-7\/","title":{"rendered":"Top 4 solar projects of the week (Oct. 3 \u2013 Oct. 7)"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Baker Solar installs rooftop system for&nbsp;Marine Group Boat Works Baker Electric Solar, a full-service solar provider, has designed and installed a 482-kW rooftop solar system for Marine Group Boat Works (MGBW), a West Coast family-owned boat building and repair company. The San Diego-based shipyard and longtime Port of San Diego<a href=\"http:\/\/solarbuildermag.com\/news\/top-4-solar-projects-week-oct-3-oct-7\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14192,2189,2906,2314,13054],"class_list":["post-228128","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baker-solar","tag-first-solar","tag-news","tag-pseg","tag-socore-energy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/228128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=228128"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/228128\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=228128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=228128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=228128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}