{"id":228130,"date":"2016-10-07T14:00:52","date_gmt":"2016-10-07T14:00:52","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14790"},"modified":"2016-10-07T14:00:52","modified_gmt":"2016-10-07T14:00:52","slug":"details-on-behind-the-meter-solarstorage-system-installed-by-heliopower","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/details-on-behind-the-meter-solarstorage-system-installed-by-heliopower\/","title":{"rendered":"Details on behind-the-meter solar+storage system installed by HelioPower"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>HelioPower&nbsp;sent word that it has installed Sharp&rsquo;s SmartStorage behind-the-meter energy storage solution at the Southern California manufacturing and distribution facility of Blisterpak, Inc., a manufacturer of thermoformed packaging and distributor of heat sealing machines. The 120-kW storage system is coupled with Blisterpak&rsquo;s recently installed 135-kW solar PV installation and the<a href=\"http:\/\/solarbuildermag.com\/news\/sharp-behind-the-meter-solarstorage-system-installed-by-heliopower\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[442,14193,2906,3000,12497,13462,13648],"class_list":["post-228130","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-energy-storage","tag-heliopower","tag-news","tag-products","tag-project","tag-sharp-electronics","tag-solarstorage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/228130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=228130"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/228130\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=228130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=228130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=228130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}