{"id":229359,"date":"2016-10-11T14:30:10","date_gmt":"2016-10-11T14:30:10","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14805"},"modified":"2016-10-11T14:30:10","modified_gmt":"2016-10-11T14:30:10","slug":"first-non-california-utility-achieves-1-gw-of-solar-energy-capacity","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/first-non-california-utility-achieves-1-gw-of-solar-energy-capacity\/","title":{"rendered":"First non-California utility achieves 1 GW of solar energy capacity"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Arizona Public Service (APS) surpassed 1 GW&nbsp;of solar energy capacity, becoming the only utility outside of California to achieve this milestone. When generating at full power, this capacity meets the partial daytime needs of 250,000 Arizona homes. The company&rsquo;s total investment in solar energy is approximately $2 billion. APS&rsquo;s solar<a href=\"http:\/\/solarbuildermag.com\/news\/first-non-california-utility-achieves-1-gw-of-solar-energy-capacity\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[404,57,9666],"tags":[2355,2906,13172],"class_list":["post-229359","post","type-post","status-publish","format-standard","hentry","category-arizona","category-leed-news","category-solar-power-energy","tag-aps","tag-news","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/229359","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=229359"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/229359\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=229359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=229359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=229359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}