{"id":22989,"date":"2014-03-05T16:48:25","date_gmt":"2014-03-05T16:48:25","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=6821"},"modified":"2014-03-05T16:48:25","modified_gmt":"2014-03-05T16:48:25","slug":"ingeteam-central-inverters-used-in-500-kw-solar-power-plant-in-puerto-rico","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ingeteam-central-inverters-used-in-500-kw-solar-power-plant-in-puerto-rico\/","title":{"rendered":"Ingeteam Central Inverters Used in 500-kW Solar Power Plant in Puerto Rico"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ingeteam has connected its first solar PV plant in Puerto Rico. The 500-kW power plant, built by WindMar Renewable Energy Inc., is also the first solar plant to have installed the transformer version of Ingeteam&rsquo;s UL compliant central inverter INGECON SUN Power Max. Moreover, these PV solar inverters have been<a href=\"http:\/\/solarbuildermag.com\/news\/ingeteam-central-inverters-used-500-kw-solar-power-plant-puerto-rico\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12491,12490,2906,12497],"class_list":["post-22989","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-inverters","tag-latin","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/22989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=22989"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/22989\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=22989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=22989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=22989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}