{"id":230369,"date":"2016-10-14T18:06:51","date_gmt":"2016-10-14T18:06:51","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14867"},"modified":"2016-10-14T18:06:51","modified_gmt":"2016-10-14T18:06:51","slug":"gamechange-solar-is-expediting-racking-production-to-beat-year-end-rush","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/gamechange-solar-is-expediting-racking-production-to-beat-year-end-rush\/","title":{"rendered":"GameChange Solar is expediting racking production to beat year-end rush"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>GameChange Solar sent word that production for piles in two through three weeks and three through four weeks for racking through year end. The service is for pile driven racking systems for orders up to 30 MW. For larger orders, up to 150 MW, production starts at two weeks for<a href=\"http:\/\/solarbuildermag.com\/news\/gamechange-solar-expediting-racking-production-beat-year-end-rush\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906],"class_list":["post-230369","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/230369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=230369"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/230369\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=230369"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=230369"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=230369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}