{"id":231370,"date":"2016-10-17T16:00:26","date_gmt":"2016-10-17T16:00:26","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14432"},"modified":"2016-10-17T16:00:26","modified_gmt":"2016-10-17T16:00:26","slug":"module-level-electronics-om-equation-looking-at-the-solutions-to-address-mlpe-issues","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/module-level-electronics-om-equation-looking-at-the-solutions-to-address-mlpe-issues\/","title":{"rendered":"Module-Level Electronics O&amp;M Equation: Looking at the solutions to address MLPE issues"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The rapid evolution of module-level electronics has spiked performance, extended reliability and crushed manufacturing prices, but there is still a ways to go before the operation and maintenance of the technology is satisfactory to all the players involved. &ldquo;When people talk about the business model for solar microinverters or optimizers,<a href=\"http:\/\/solarbuildermag.com\/featured\/solar-module-level-electronics-om-service-problems-solutions\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13469,4737,12491,12874,13541,12895,3078,13740,3000,13095,14207,13939],"class_list":["post-231370","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-apsystems","tag-featured","tag-inverters","tag-microinverters","tag-mlpe","tag-namaste-solar","tag-om","tag-optimizers","tag-products","tag-residential-solar","tag-september-october-2016-print-issues","tag-sonnen"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/231370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=231370"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/231370\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=231370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=231370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=231370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}