{"id":23173,"date":"2014-03-11T15:57:53","date_gmt":"2014-03-11T15:57:53","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=6848"},"modified":"2014-03-11T15:57:53","modified_gmt":"2014-03-11T15:57:53","slug":"gestamp-solar-8minutenergy-renewables-to-build-50-mw-solar-farm-in-california","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/gestamp-solar-8minutenergy-renewables-to-build-50-mw-solar-farm-in-california\/","title":{"rendered":"Gestamp Solar, 8minutenergy Renewables to Build 50-MW Solar Farm in California"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Gestamp Solar&nbsp;and&nbsp;8minutenergy Renewables LLC&nbsp;announced the signing of a 20-year contract to sell 50 MWac (66.5 MWdc) of clean, renewable solar energy from their Midway Solar Farm project in Imperial County, Calif., to Pacific Gas and Electric Company (PG&amp;E). &nbsp;The transaction was conducted with 83WI &nbsp;8ME, LLC, a subsidiary of Calif.-based<a href=\"http:\/\/solarbuildermag.com\/news\/gestamp-solar-8minutenergy-renewables-build-50-mw-solar-farm-california\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-23173","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=23173"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23173\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=23173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=23173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=23173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}