{"id":23177,"date":"2014-03-11T18:34:18","date_gmt":"2014-03-11T18:34:18","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=6853"},"modified":"2014-03-11T18:34:18","modified_gmt":"2014-03-11T18:34:18","slug":"suniva-solar-modules-power-va-medical-center-in-florida","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/suniva-solar-modules-power-va-medical-center-in-florida\/","title":{"rendered":"Suniva Solar Modules Power VA Medical Center in Florida"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Suniva Inc., a metro-Atlanta based manufacturer of high-quality, high-efficiency crystalline silicon solar cells and modules, today announces its Buy America-compliant modules power the Department of Veterans Affairs Medical Center (VAMC) in West Palm Beach, Fla. The VAMC is one of numerous government facilities in the United States, Powered by Suniva,<a href=\"http:\/\/solarbuildermag.com\/news\/suniva-solar-modules-power-va-medical-center-florida\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12487,2906,12497,9751],"class_list":["post-23177","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-modules","tag-news","tag-project","tag-south"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=23177"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23177\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=23177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=23177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=23177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}