{"id":23339,"date":"2014-03-19T17:00:14","date_gmt":"2014-03-19T17:00:14","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=6912"},"modified":"2014-03-19T17:00:14","modified_gmt":"2014-03-19T17:00:14","slug":"array-technologies-tracking-systems-to-power-26-mw-project-with-quanta-power","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/array-technologies-tracking-systems-to-power-26-mw-project-with-quanta-power\/","title":{"rendered":"Array Technologies Tracking Systems to Power 26-MW Project with Quanta Power"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Array Technologies Inc. and Quanta Power Generation Inc. have signed a new supply contract for a 26-MWdc DuraTrack HZ single-axis tracking system destined for the CED White River Solar 2 project, which will be constructed by Quanta and owned and operated by CED White River Solar 2 LLC.&nbsp; Forming a<a href=\"http:\/\/solarbuildermag.com\/news\/array-technologies-tracking-systems-power-26-mw-project-quanta-power\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497,12500],"class_list":["post-23339","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project","tag-tracking"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=23339"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23339\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=23339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=23339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=23339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}