{"id":234444,"date":"2016-10-27T19:17:20","date_gmt":"2016-10-27T19:17:20","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=14945"},"modified":"2016-10-27T19:17:20","modified_gmt":"2016-10-27T19:17:20","slug":"8minutenergy-renewables-is-raising-capital-for-its-5-5-gw-pv-pipeline","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/8minutenergy-renewables-is-raising-capital-for-its-5-5-gw-pv-pipeline\/","title":{"rendered":"8minutenergy Renewables is raising capital for its 5.5 GW PV pipeline"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>8minutenergy Renewables, LLC is initiating a capital raising process to fuel growth of its 5.5 GW U.S. pipeline, including over 500 MW of wholly-owned near shovel ready projects with long term power purchase agreements (PPA). 8minutenergy has retained BofA Merrill Lynch as its financial advisor. The near term projects are<a href=\"http:\/\/solarbuildermag.com\/news\/8minutenergy-renewables-is-raising-capital-for-its-5-5-gw-pv-pipelines\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14184,2906],"class_list":["post-234444","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-8minutenergy-renewables","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/234444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=234444"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/234444\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=234444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=234444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=234444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}