{"id":236917,"date":"2016-05-25T12:31:06","date_gmt":"2016-05-25T12:31:06","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=d295351d8a8d19cc70c34d257ba364b2"},"modified":"2016-05-25T12:31:06","modified_gmt":"2016-05-25T12:31:06","slug":"power-tester-aids-evhev-igbt-thermal-reliability-assessment-2","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/power-tester-aids-evhev-igbt-thermal-reliability-assessment-2\/","title":{"rendered":"Power Tester aids EV\/HEV IGBT thermal reliability assessment."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Recording all diagnostic information during use, MicReD&reg; Power Tester 600A lets electric and hybrid vehicle (EV\/HEV) engineers test power electronics for mission-critical thermal reliability and lifecycle performance. Power cycles are fully automated, and T3Ster&reg; structure function yields non-destructive failure-in-progress data for each IGBT. Up to&nbsp;8 testers can be chained together to power cycle up&nbsp;to 128 IGBTs simultaneously in&nbsp;system test.<\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/\" target=\"_blank\"><\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/\" target=\"_blank\"><\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/\" target=\"_blank\"><\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/\" target=\"_blank\"><\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/electronic-testers-84510809-1.html\" target=\"_blank\">Electronic Testers<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/automotive-testers-84430404-1.html\" target=\"_blank\">Automotive Testers<\/a>  |  <a href=\"http:\/\/www.thomasnet.com\/products\/electric-test-equipment-84330869-1.html\" target=\"_blank\">Electric Test Equipment<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-236917","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/236917","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=236917"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/236917\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=236917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=236917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=236917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}