{"id":23801,"date":"2014-03-27T19:10:53","date_gmt":"2014-03-27T19:10:53","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=6996"},"modified":"2014-03-27T19:10:53","modified_gmt":"2014-03-27T19:10:53","slug":"martifer-solar-brings-39-mw-solar-plant-online-in-mexico","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/martifer-solar-brings-39-mw-solar-plant-online-in-mexico\/","title":{"rendered":"Martifer Solar Brings 39-MW Solar Plant Online in Mexico"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Martifer Solar, a subsidiary of Martifer SGPS, and Gauss Energ&iacute;a inaugurated the Aura Solar project &ndash; bringing online Latin America&rsquo;s largest grid-connected PV plant, with a total capacity of 39 MWp. The ceremony was highlighted with the presence of Enrique Pe&ntilde;a Nieto, the President of Mexico, which attested to the<a href=\"http:\/\/solarbuildermag.com\/news\/martifer-solar-brings-39-mw-solar-plant-online-mexico\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5462,57,9666],"tags":[2906,12497],"class_list":["post-23801","post","type-post","status-publish","format-standard","hentry","category-canada-international","category-leed-news","category-solar-power-energy","tag-news","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=23801"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/23801\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=23801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=23801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=23801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}