{"id":24203,"date":"2014-04-07T18:31:37","date_gmt":"2014-04-07T18:31:37","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7036"},"modified":"2014-04-07T18:31:37","modified_gmt":"2014-04-07T18:31:37","slug":"onforce-solar-completes-402-kw-rooftop-installation-in-new-york","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/onforce-solar-completes-402-kw-rooftop-installation-in-new-york\/","title":{"rendered":"OnForce Solar Completes 402-kW Rooftop Installation in New York"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>OnForce Solar, a leading provider of solar electric systems, has announced that they have completed a 40-2kW rooftop solar installation for Price Master Corporation at its corporate office and warehouse distribution center located in Queens, N.Y. The 402-kW system integrates Con Edison&rsquo;s SCADA (supervisory control and data acquisition) system that<a href=\"http:\/\/solarbuildermag.com\/news\/onforce-solar-completes-402-kw-rooftop-installation-new-york\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9726,12497,12565],"class_list":["post-24203","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-northeast","tag-project","tag-rooftop"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24203"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24203\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24203"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}