{"id":24367,"date":"2014-04-10T16:49:59","date_gmt":"2014-04-10T16:49:59","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=7054"},"modified":"2014-04-10T16:49:59","modified_gmt":"2014-04-10T16:49:59","slug":"rgs-energy-to-install-6-7-mw-of-solar-for-california-school-district-at-22-sites","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/rgs-energy-to-install-6-7-mw-of-solar-for-california-school-district-at-22-sites\/","title":{"rendered":"RGS Energy to Install 6.7 MW of Solar for California School District at 22 Sites"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>RGS Energy and SEC SUSD Solar One LLC, have executed agreements to begin construction on solar energy projects at up to 22 sites within the Stockton Unified School District (SUSD) in California. When completed later this year, the solar PV sites will generate a total of up to 6.7 MW<a href=\"http:\/\/solarbuildermag.com\/news\/rgs-energy-install-6-7-mw-solar-california-school-district-22-sites\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9667,12497],"class_list":["post-24367","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pacific","tag-project"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=24367"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/24367\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=24367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=24367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=24367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}