{"id":244438,"date":"2016-11-29T16:12:07","date_gmt":"2016-11-29T16:12:07","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15528"},"modified":"2016-11-29T16:12:07","modified_gmt":"2016-11-29T16:12:07","slug":"coronal-tulare-solar-facility-now-delivering-power-to-southern-california-edison","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/coronal-tulare-solar-facility-now-delivering-power-to-southern-california-edison\/","title":{"rendered":"Coronal Tulare solar facility now delivering power to Southern California Edison"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Coronal Energy, powered by Panasonic, sent word that its Coronal Tulare, a 34 MWac (44.2 MWdc) solar energy facility, began commercial operation in mid-September. The project delivers power to Southern California Edison (SCE) through a 20-year power purchase agreement. It is expected to generate 87,500 MWh annually, enough electricity to<a href=\"http:\/\/solarbuildermag.com\/news\/coronal-tulare-solar-facility-now-delivering-power-to-southern-california-edison\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14291,2906,9974,13172],"class_list":["post-244438","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-coronal-energy","tag-news","tag-projects","tag-utility"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/244438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=244438"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/244438\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=244438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=244438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=244438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}