{"id":244659,"date":"2016-11-30T14:03:11","date_gmt":"2016-11-30T14:03:11","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=15541"},"modified":"2016-11-30T14:03:11","modified_gmt":"2016-11-30T14:03:11","slug":"baker-electric-solar-installs-solar-system-at-san-diego-based-targetcw","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/baker-electric-solar-installs-solar-system-at-san-diego-based-targetcw\/","title":{"rendered":"Baker Electric Solar installs solar system at San Diego-based TargetCW"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Baker Electric Solar, a full-service solar provider, designed and installed a 65.52 kW rooftop solar system for contingent workforce services firm, TargetCW, which has a 25,000-sq-ft facility. The rooftop solar installation will produce roughly 45&nbsp;percent of the company&rsquo;s annual electricity needs and save the company more than $24,000 on its<a href=\"http:\/\/solarbuildermag.com\/news\/baker-electric-solar-installs-solar-system-at-san-diego-based-targetcw\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13914,13203,2906,9974],"class_list":["post-244659","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baker-electric-solar","tag-commercial","tag-news","tag-projects"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/244659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=244659"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/244659\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=244659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=244659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=244659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}